• UR.com
  • Academy
  • UR Connect
  • Customers
  • Partners
  • Case Studies
  • UR Marketplace
Universal RobotsUniversal Robots
  • Products
  • Solutions
  • Physical AI
  • Education
  • Support
  • Company
  • Contact Us
Cancel
  1. Home
  2. Company
  3. News & Media
  4. Video Library
  5. Drywall finishing robots accelerate construction schedules
  6. Back to Video Library

Drywall finishing robots accelerate construction schedules

Watch how Canvas integrates UR collaborative robots into their drywall finishing machine, dramatically reducing time and manual labor in this demanding task.

Learn more

Canvas
May 13, 2025

Canvas

Construction sites, long considered bastions of manual labor, are experiencing a technological shake-up thanks to Canvas, a San Francisco startup that has developed a robotic system to tackle the arduous task of drywall finishing. By integrating UR10e cobots, Canvas has created a machine that dramatically reduces the time and effort involved in this traditionally labor-intensive trade.

Robotic Arm Design
November 18, 2022

Robotic Arm Design

Discover robotic arm design with Universal Robots—mechanical and electronics basics, key components, and why degrees of freedom, workspace, and end-effector choice matter for performance.

UR12e
Universal Robots

UR12e

Medium sized versatility: 12.5kg payload, 1300mm reach, Ø 190mm footprint, just 33.5kg.

Contact Us

Universal Robots

Local Office

Universal Robots USA, Inc
27175 Haggerty Road, Suite 160
48377 Novi, MI
Contact us: +1 844-462-6268
UR Hotline: + 1-844-GO-COBOT
sales@universal-robots.com

Products & Solutions

  • Cobots
  • Accessories
  • Physical AI
  • Academy
  • Get a Live Demo​

Discover UR

  • Tech Resources
  • Forum
  • FAQ
  • Data Notice
  • General Terms of Delivery

© 2026 Universal Robots A/S

  • Cookie Policy
  • Privacy Policy